I have to figure out the best way to install in on the bike. So far I think I am going to use the tape feature as this maybe the easiest installation.
So far the list of work to be completed includes:
- All fluid change
- XM Radio install
- Rear straps install
The starting date is JUNE 1. I have put in for the vacation time and started telling people of the departure date. I want to use the Tax Day Ride as the test ride for the bike after the service. The first 16 days of June should be an adventure.
No comments:
Post a Comment